3 Commits

Author SHA1 Message Date
Simone c12fcbc434 docs(bridge): Phase A→B bridge checklist completed
All sections done: SSH keys, BuildVMGuest password, Gitea PAT,
OpenSSH Server, template powered-off verification, CI backup.
Fixed errata: .vmsn always present (not error indicator), backup
switched from Git tar to 7z LZMA2, removed scheduled-task section
(no CI-* tasks exist on this host).

Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-06-07 11:30:20 +02:00
Simone 89299b91c7 docs(runbook): record Windows host pre-migration baseline
Phase A benchmark data (2026-05-17): VM lifecycle avg 60.6s boot,
smoke job avg 27s Win / 49s Linux, 100% success rate (12/12 burn-in).
B7 reference thresholds: Win ≤32s, Linux ≤59s.

Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-06-07 11:30:20 +02:00
Simone 0d6486b19b chore(plans): archive Phase A and B completed documents
Moves all A/B closeouts, checklists, idea docs, and implementation plans
to plans/archived/2026-05-23/. Both phases are production-stable.

Active plans remaining in plans/:
  - idea-3-powershell-removal.md  (Phase C — in progress)
  - idea-3-esxi-support.md        (Phase D — future)
  - ideas-overview.md             (roadmap reference)

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-05-23 19:52:09 +02:00