Phase B is closed (checklist Passi 1–9 [x], benchmark matrix §6–§14
recorded). Move the two finished working docs into the dated archive:
plans/PhaseB-user-checklist.md → plans/archived/2026-06-07/
plans/benchmark-windows-host.md → plans/archived/2026-06-07/
plans/ now holds only the forward-looking plans (idea-3 Phase C pwsh
removal, idea-4 Phase D ESXi, ideas-overview). Fixed the live links that
pointed at the moved/relocated files: idea-3 §4, idea-2 §8 (relative path),
and ideas-overview (idea-1/idea-2 now under archived/, Phase A+B marked ✅).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Concurrent capacity burn-in run on the Linux host as ci-runner with the
static-IP pool: WinBuild2025 40/40 PASS (~78.6s/round) and LinuxBuild2404
40/40 PASS (~70.2s/round) — 80/80 jobs, 20/20 rounds, near-deterministic
(static IP eliminates the DHCP IP-acquire variance of the §6/§7 baselines).
- RUNBOOK §9: concurrent burn-in result + ip-pool reset/recovery note.
- PhaseB-user-checklist Passo 7/8 marked done; fixed two checklist bugs:
run as ci-runner (the simone path needs g+w on the /var/lib/ci root for
ip-pool.tmp, not just the sub-dirs), and the Linux command was missing
-SnapshotName BaseClean-Linux (default BaseClean is Windows-only).
- idea-2-linux-host §8 DoD: Phase B complete (B1–B7 + >2 weeks stability).
- TODO §2.8 [P2]: ip-pool is not reconciled against live clones; a killed
job leaks its lease permanently and exhausts the 4-IP pool. Proposed fix.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Moves all A/B closeouts, checklists, idea docs, and implementation plans
to plans/archived/2026-05-23/. Both phases are production-stable.
Active plans remaining in plans/:
- idea-3-powershell-removal.md (Phase C — in progress)
- idea-3-esxi-support.md (Phase D — future)
- ideas-overview.md (roadmap reference)
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>