Files
local-ci-cd-system/plans/archived
Simone 5bff7b4f0c docs: close Phase B (B7 concurrent burn-in PASS + B8 stability)
Concurrent capacity burn-in run on the Linux host as ci-runner with the
static-IP pool: WinBuild2025 40/40 PASS (~78.6s/round) and LinuxBuild2404
40/40 PASS (~70.2s/round) — 80/80 jobs, 20/20 rounds, near-deterministic
(static IP eliminates the DHCP IP-acquire variance of the §6/§7 baselines).

- RUNBOOK §9: concurrent burn-in result + ip-pool reset/recovery note.
- PhaseB-user-checklist Passo 7/8 marked done; fixed two checklist bugs:
  run as ci-runner (the simone path needs g+w on the /var/lib/ci root for
  ip-pool.tmp, not just the sub-dirs), and the Linux command was missing
  -SnapshotName BaseClean-Linux (default BaseClean is Windows-only).
- idea-2-linux-host §8 DoD: Phase B complete (B1–B7 + >2 weeks stability).
- TODO §2.8 [P2]: ip-pool is not reconciled against live clones; a killed
  job leaks its lease permanently and exhausts the 4-IP pool. Proposed fix.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-07 01:44:56 +02:00
..